Industry Transporters Wiki
Advertisement

Info:[]

Info Strasse05

(demolish costs are halve of the normal cost)

Name: street

Cost: 2.250 $

Lanes: 1/1 (one for left other for right)

Max Speed: 100 KM/h | 62 Mph

Length: 1 Field

Width: 1 Field

Bridge Cost: 5.700 $

Tunnel Cost: 7.000 $

Advertisement